²ÝÝ®´«Ã½

Skip to main content
Start of main content

Building Dubai¡¯s first integrated cancer hospital using Autodesk Forma

October 06, 2025

Our team engaged Autodesk Forma to accelerate early stage design for Dubai¡¯s integrated cancer hospital by providing real-time environmental insights

Autodesk Forma helped our design team accelerate the early stage design for Dubai¡¯s first integrated cancer hospital. How? It provided real-time environmental insights¡ªincluding wind, solar, and embodied carbon analysis. Those insights allowed the team to consider shading strategies, energy efficiency, and LEED Gold alignment from the outset.

The team evaluated dozens of site-specific scenarios, reduced rework, and streamlined cross-border collaboration. They were able to use Forma and Revit together. And it helped speed up design decisions and delivery.

Autodesk¡¯s cloud-shared data tools allowed our team¡¯s 120 employees, who were spread across 12 time zones, to collaborate on the project.

  • David Martin

    David is an architect who has led the design for many of our award-winning healthcare, research, and education projects.

    Contact David
  • Darren Burns

    Darren is an architect, designer, and leader with over 20 years of experience specializing in the commercial sector, particularly in retail, mixed-use, and complex project delivery.

    Contact Darren
End of main content
To top